Case Studies

City of Orillia – Complete Marina Replacement
Location – Orillia, ON Supply and installation of 220 new floating slips using steel tube floating docks and Moistureshield composite decking. The project also included all new Eaton Lighthouse pedestals. Completion – 2012

Point Retreat Condominiums
Location – Huron, Ohio Supply and installation of 80 new floating slips using steel tube floating docks and ThruFlow non-skid decking panels. The system is exposed to 3+ knot currents during times of heavy run-off. Completion – 2013

Leamington Marina
Location – Leamington, ON Supply and installation of floating dock with anchoring system for sixty boats with fingers up to 60’ in length. Supply and installation of power and water was included. Completion – 2018

LaSalle Park Marina – Floating Breakwater
Location – Burlington, ON Design, supply, and installation of over 1,200’ of floating breakwater with anchoring system. The units ranged from 14’ to 17’ wide and included maintenance catwalks, solar lighting, and signage. Completion – 2020

City of Elliot Lake – Floating Boardwalk
Location – Elliot Lake, ON Design, supply, and installation of over 470’ of floating boardwalk plus a separate dock with slips for 20 boats. The units were all steel-pipe floating sections with composite decking. The project was completed in two phases, and included aluminum access ramps, railings, shade sails, benches, and solar lighting. The entire […]