Case Studies

Curved dock system with fingers

Kropf Marine Completes Marina Renovation on Tight Timeline

Location – Mississauga, ON Kropf Marine has completed delivery of a new commercial floating dock system at Credit Village Marina, including a unique curved main dock, as well as numerous upgrades and safety features. Credit Village Marina, owned and operated by the City of Mississauga, is located on the Credit River near the mouth of […]

Conolift SP-50 Hydraulic Trailer for Catamarans Demonstrates Versatility

Location – North Charleston, South Carolina Cooper River Boatyard recently took delivery of a new Conolift SP-50 hydraulic boat trailer. This self-propelled trailer has a capacity of 100,000 lbs, and includes integrated drive and steer capabilities with 180 degree front steering wheels for maximum manoeuvrability. The frame expands in width and raises and lowers hydraulically, […]

LaSalle Park Marina – Floating Breakwater

LaSalle Park Marina – Floating Breakwater

Location – Burlington, ON Design, supply, and installation of over 1,200’ of floating breakwater with anchoring system. The units ranged from 14’ to 17’ wide and included maintenance catwalks, solar lighting, and signage. Completion – 2020

elliot lake boardwalk

City of Elliot Lake – Floating Boardwalk

Location – Elliot Lake, ON Design, supply, and installation of over 470’ of floating boardwalk plus a separate dock with slips for 20 boats. The units were all steel-pipe floating sections with composite decking. The project was completed in two phases, and included aluminum access ramps, railings, shade sails, benches, and solar lighting. The entire […]

City of Orillia – Complete Marina Replacement

City of Orillia – Complete Marina Replacement

Location – Orillia, ON Supply and installation of 220 new floating slips using steel tube floating docks and Moistureshield composite decking. The project also included all new Eaton Lighthouse pedestals. Completion – 2012

Point Retreat Condominiums

Point Retreat Condominiums

Location – Huron, Ohio Supply and installation of 80 new floating slips using steel tube floating docks and ThruFlow non-skid decking panels. The system is exposed to 3+ knot currents during times of heavy run-off. Completion – 2013

Leamington Marina

Leamington Marina

Location – Leamington, ON Supply and installation of floating dock with anchoring system for sixty boats with fingers up to 60’ in length. Supply and installation of power and water was included. Completion – 2018